Redstone concentrated solar thermal power (CSP) project is a solar power plant with molten salt energy storage, located in Postmasburg, near Kimberley, in the Northern Cape Region of South Africa.  Redstone has the capacity of 100 megawatts to deliver power to 200,000 people and it is capable of storing thermal energy for a period of 12 hours, which enables the plant to generate electricity through the night in addition to day time operations.

ACWA Power, the top tier global power developer, has been awarded the contract by The South Africa Department of Energy (DOE) to develop the project along with the consortium of Solar Reserve. SEPCOIII, China is in charge of the engineering, procurement, and construction of the plant.

FERBECK INTERNATIONAL SA has been awarded a civil construction contract for one 211.6 meters-height solar tower by SEPCOIII, China.

ABOUT THE PLANT

  • Type of plant
    Solar thermal power station
  • Owner
    ACWA, Saudi Arabia
  • Contractor
    SEPCOIII, China

ABOUT THE TOWER

  • Year
    Completed in 2023
  • Type of tower
    Solar tower with foundation included
  • Height
    211.6m
  • Ø
    From 23m (bottom) to 18m (top)

A part of


www.ferbeckinternational.com
Legal Notice | Privacy Policy | Site map

WSF © 2019 -

LISBON

Headquarter

  • Av. D. João II, nº 45

  • 3rd Floor, 1990-084

  • Lisbon, Portugal

  • +351 218 429 270

JAKARTA

Indonesian Branch

  • L'Avenue Office Building

  • Jl. Raya Pasar Minggu Kav 16 Pancoran

  • Jakarta Selatan, Indonesia

  • +62 21 8066 7250

DHAKA

Bangladesh Branch

  • Kha-48/B Pragati Sarani

  • Shahjadpur, Gulshan

  • Dhaka-1212, Bangladesh

  • +880 2 55048009