Jawa 9 and 10 are two coal-fired power plant units that is  developed as an expansion of the existing Suralaya coal-fired steam power plant  located in Pulomerak District, Cilegon, Banten, Indonesia. Each unit will have a capacity of 1GW each. Indonesia is expected to have 443 Terrawatt hour of electricity demand by 2027 from approximately 78.4 million consumers and electrification ratio of approximately 99%. The demand for electricity is expected to grow at 6.89% annually. To meet this demand, the country is expected to require the development of more than 290 power plants. The Jawa 9 and 10 power plants are part of the plans to fulfil this demand.

The project is owned by PT PLN, a national electricity utility owned by the Indonesian government. PT Hutama Karya is in charge of the engineering, procurement, and construction (EPC).

FERBECK INTERNATIONAL SA has been awarded an EPC contract for one 265 meters-height concrete chimney by PT Hutama Karya, Indonesia.

ABOUT THE PLANT

  • Type of plant
    Coal-fired power plant
  • Owner
    PLN Indonesia
  • Contractor
    PT Hutama Karya, Indonesia

ABOUT THE STACK

  • Year
    2020–ongoing
  • Skin
    Double skin steel stack
  • Height
    265m
  • Ø
    8,5m
  • Liners
    2 carbon steel liners with borosilicate

A part of


www.ferbeckinternational.com
Legal Notice | Privacy Policy | Site map

WSF © 2019 -

LISBON

Headquarter

  • Av. D. João II, nº 45

  • 3rd Floor, 1990-084

  • Lisbon, Portugal

  • +351 218 429 270

JAKARTA

Indonesian Branch

  • L'Avenue Office Building

  • Jl. Raya Pasar Minggu Kav 16 Pancoran

  • Jakarta Selatan, Indonesia

  • +62 21 8066 7250

DHAKA

Bangladesh Branch

  • Kha-48/B Pragati Sarani

  • Shahjadpur, Gulshan

  • Dhaka-1212, Bangladesh

  • +880 2 55048009