The Jawa 9 and 10 power plants, each with a capacity of 2x1000MW, are critical to Indonesia’s plan to meet its rising electricity demand. Owned by PLN Indonesia and executed by PT Hutama Karya, the project includes constructing a 266.5-meter high cylindrical concrete chimney. FERBECK INTERNATIONAL SA holds the EPC contract for this chimney, featuring two carbon steel liners with borosilicate protection.