Rechercher

The Shell Refinery

The Netherlands 2023

The Challenge
Engineering and procuring a 99-meter double skin steel stack at the Shell Refinery in Pernis, Rotterdam presented several challenges:

  • Scale and Complexity: The Pernis refinery, one of the largest globally, covers 550 hectares and processes 20 million tonnes of crude oil annually. Shell, as a leading oil and gas company, upholds extremely high standards and stringent quality specifications.
  • High Quality Demands: During the design stage, every detail must meet rigorous standards. The client’s expectations are meticulous, demanding careful oversight of every aspect of the project.


The Solution
FERBECK INTERNATIONAL SA delivered a tailored solution:

  • Material Expertise: Selected materials were chosen for their corrosion resistance and suitability for high-temperature applications, enhancing the stack’s durability and performance.
  • Detailed Engineering: Provided comprehensive engineering designs that met requirements. The designs included platforms, a tuned mass damper, ladders, and a lightning protection system.
  • Procurement: Managed procurement processes to source materials and components.

The steel stack was CE marked according to EN 13084 and EN 1090.

Related Projects

FORMULAIRE DE DEMANDE

Politique Qualité

En soumettant ce formulaire, vous acceptez que vos données personnelles soient utilisées pour traiter votre demande et vous recontacter au sujet de nos produits, services ou besoins liés à votre demande, conformément au règlement européen sur la protection des données (RGPD).

CONTACT