The Jimah East power project, known as the Tuanku Muhriz power station, is a significant 2×1000 MW ultra-supercritical coal-fired power plant located in Port Dickson, Negri Sembilan, Malaysia, approximately 80km from Kuala Lumpur. The plant is owned and operated by Jimah East Power (JEP), a joint venture involving Tenaga Nasional Berhad (TNB), Mitsui, and Chugoku Electric Power. The project, awarded in September 2014, involves a consortium of Toshiba Corporation, IHI Corporation, Hyundai Engineering Co., Ltd., and Hyundai Engineering & Construction Co., Ltd. FERBECK INTERNATIONAL SA was tasked with the EPC contract for constructing a 160-meter high concrete chimney and two 47-meter high concrete silos by Hyundai Engineering Co., Ltd.