The Turano Lodigiano-Bertonico power plant, consisting of 2 x 265 MW and 1 x 270 MW CCGT units, was commissioned in 2010 and is owned by Sorgenia SpA. Ansaldo Energia SpA (AEN) undertook the engineering, procurement, and construction (EPC) contract for this project. Sorgenia, a prominent player in Italy’s energy and gas sector, prioritizes environmental concerns. FERBECK INTERNATIONAL SA secured the EPC contract for constructing a 100-meter high concrete chimney, adding to the plant’s infrastructure.